PYRRHA
Project Details
Project Details
PYRRHA
9,700 sf development with a 6-storey industrial tower with light manufacturing and showroom space. The building was supplied on a just in time basis as there was no available laydown space on the project. Seagate provided pre-coordination, logistics, material supply, material finishing, and installation on this project.
- Client – Pyrrha
- General Contractor – Kindred Construction Ltd.
- Architect – Birmingham & Wood
- Engineers – Fast & Epp Structural Engineers
- Material fabricated by – KLH