Project Details

PYRRHA

9,700 sf development with a 6-storey industrial tower with light manufacturing and showroom space. The building was supplied on a just in time basis as there was no available laydown space on the project. Seagate provided pre-coordination, logistics, material supply, material finishing, and installation on this project.

  • Client – Pyrrha
  • General Contractor – Kindred Construction Ltd.
  • Architect – Birmingham & Wood
  • Engineers – Fast & Epp Structural Engineers
  • Material fabricated by – KLH